River hydroelectric power station

Energy Cluster

River hydroelectric power station

  • first licensed hydroelectric power station in the canton of Zug

  • with a neat museum, which shows, among other things, the original turbine of the old paper factory power station

  • with climbing aids for fish including a beaver ladder

  • around 50% of the energy required on the Papieri site is produced on site in Cham. The power station is part of it.

Commissioning December 2022